Logistic before & during Construction of Multistory buldings

Before and during construction of multistory building there is so many things to be considered and studied carefully  to maintain proper logistic during construction period

  1. Number and location of Towers cranes to cover all the area of the parcel and the boundary.
  2. Numbers and locations of placing booms to cover all the areas of the parcel.
  3. Location of stationary pump.
  4. Numbers and locations of the Hoist.
  5. Locations of Garbage Chute.
  6. Loading plate form for Facade panels  and other materials.
  7. Temporary ventilation system at basements
  8. Numbers and locations of toilets as per standard.
  9. Locations of septic tank
  10. Drinking waters.
  11. Tower Crane support to be ready before every jumping.
  12. office at location not affecting the progress. 
to be continued ....Ask me ..